What are well completion activities?

Well completion is a series of processes performed on a drilled and cased oil & gas well, in order to prepare it for production. It involves running production tubing and downhole tools (e.g. mandrels, downhole safety valve, pump, etc.) as required.

What are the new techniques in well completion?

Some new technologies have been developed for horizontal well sand control completion in recent years, including “mud cake” cleaning technology, screen top cementing technology, casing-outside gravel packing sand control technology.

What is well completion in drilling?

Well completion is the process of making a well ready for production (or injection) after drilling operations.

hOW LOng DOEs well completion taKE?

hOW LOng DOEs it taKE tO cOMPLEtE a WELL? On average, it takes two days to frac each well and EnCana typically drills 2-4 wells per pad. A 15-man crew generally works from dawn to dusk, 5 to 6 days per week.

What is a Well Completion Report?

Water well completion reports or “well logs” include information about well including the construction, location, yield, geology, and depth. This vital water supply information is often not in the possession of the water supply owner unless they had the original well drilled.

What is gravel pack in well completion?

Gravel packing is a sand-control method used to prevent the production of formation sand. Gravel packing is used in conjunction with hydraulic fracturing, but at much lower pressures. Formation sand is produced from the breakdown of formations where wells are located.

What are the components of well completion?

A well completion consists of two parts, the sand-face completion that provides the interface between the reservoir rock and the wellbore, and the upper completion, comprising equipment installed within the last casing string to control and monitor the well flow and ensure well safety.

What is well completion equipment?

Completion equipment are those equipment which are used to bring an oil well to the completion state so that first test production and later on commercial production can be started from it.

What is the final step in a well life cycle?

When the well no longer produces at an economic rate, the final steps in a well’s life cycle are abandonment and reclamation. The wellhead and associated equipment are removed, the wellbore is filled with cement, and the well capped and marked. The area is reclaimed and the lease is relinquished back to the landowner.

What is liner in well completion?

Liner completions are similar to open hole completions in that casing must be set prior to drilling the producing interval. The advantage of a liner completion is that the drilling fluid system can be changed and a nondamaging fluid used to drill the pay interval.

What is the size of gravel pack?

The gravel-pack sand size is determined by multiplying the median formation grain size by 6. This value is the median gravel grain size.

Why are gravel packs used in wells?

The main goal of gravel packing is to stabilize the formation and maintain well productivity. During this operation, a steel screen is placed in the well – the well is then packed with gravel of a specific size to prevent the passage of formation sand.

What factors should be considered when designing a completion?

Factors that affect the design of completion systems

  • Packers.
  • Elastomers.
  • Flow control equipment.
  • Equipment metallurgy.
  • Equipment standards and grades such as ISO and API.
  • Understanding the impact of force and length changes to the tubing string.
  • Operational mode of the well (production, shut-in, injecting, treating)

How many stages are there in the development of an oil well?

All Oil & Gas field typically go throw three production phases: buildup, plateau, and decline in production. When production reach a point where it is no more cost-effective, the field enters a final stage called abandonment, also known as decommissioning. some of the activities are: P&A of producing and injector wells.

What is a well completion Report?

What are well completion reports?

What is the difference between liner and casing?

Casing is very necessary for smooth drilling operations in deep and ERD wells so that hole collapsing may be got rid of. Liner is a string of casing which does not extend to the surface but is hung from inside the previous casing string and is cemented in place.

What is pack aquifer ratio?

The pack-aquifer ratio (ratio of the 30 or 50% size of the gravel-pack material to 30 or 50% size of the aquifer material) should be 4:1 if the aquifer material is fine and uniform. However, if aquifer material is coarse and non-uniform, the pack-aquifer ratio should be 6:1.

How does a gravel pack completion work?

The casing gravel pack completion procedure includes drilling through the oil reservoir to design depth, running production casing to the bottom of the oil reservoir, cementing, and then perforating the oil reservoir.

What is a well filter pack?

A filter pack is coarse sand or fine gravel (2-6 mm diameter) that is placed between the borehole wall and screen (see Section 9 – Figure 15). Filter packs are used to settle-out fine grained particles that may otherwise enter the well and to increase the effective hydraulic diameter of the well.

What is the completion technique applied to a well?

The completion technique applied to a well depends on whether the well is a producing well or an injection well. For a producing well, the number of different reservoirs that may eventually be produced is significant. A decision must be made on whether a single or multiple completion will be made.

What are the requirements for well completions?

Well completions must ensure that the completion resists corrosion and creep and does not collapse into the reservoir or the wellbore. Well completions should also ensure a means to detect and assess changes in the reservoir conditions and hydrocarbon flow rate by well tests.

What are the different types of wellbore completions?

Figure 1 Wellbore diagram of (a) an open hole completion and (b) a slotted liner completion. Completions can be divided into three categories: open hole completions, liner completions, and perforated casing completions.

How do well completions affect oil and gas production?

Well completions must get the wells ready for the subsequent stages of oil or gas extraction. Ultimately, the way in which engineers decide to complete a well will impact the rate of oil and gas production and will directly influence the time over which oil and gas will be pumped from the well.